Their website says:
"Over coating can be carried out once film is hard dried – but high solvency top coats should be applied after 24 hrs"
Their PDF product download says:
"Over coating can be carried out once film is hard dried as described above – but high solvency top coats should only be applied after 96 hrs"
How long is the "usual" drying time before over coating? I'm intending to use an epoxy primer prior to the colour and leaving it a day or two is fine but if I leave it 4 days before priming I'll never get the job done!
Stu.