My Rolling Project
#226
Posted 01 April 2012 - 12:16 PM
#227
Posted 01 April 2012 - 06:07 PM
looking good keep up the good work
Thanks mate!
I need to turn the engine over by hand, to make sure everything turns no the head is on.
The tappets need to be set. And the timing etc.
The A panels are lined up and will be welded on next week, the brakes also.
I reckon it could be on the road in the next week or so. Fingers crossed
#228
Posted 02 April 2012 - 08:36 AM
The engine is together - Big thanks again to Ratty!
Jobs to do
- Turn engine over by hand to see if all is ok - 02.04.12
- Set tappets - 02.04.12
- Fit rocker cover - TBC
- Weld A panels - 02.04.12
- Seam seal and prime - Easter weekend
- Shultz the inside of the wings, - Easter weekend
- Fit brakes and front brake lines, cylinders etc - TBC
- Finish off winscreen surround - Start 02.04.12
- Paint windscreen surround - Easter weekend
- Fit windscreen - As above
- Fit engine and linkages, - TBC
- Fit manifold and exhaust - TBC
- Fit the top end, carbs, inlet etc. - TBC
- Fit new rad. - TBC
- Paint front end. - Easter weekend
- Fit lights and brightwork back to the car. - After the easter weekend
Edited by mymini007, 02 April 2012 - 08:43 AM.
#229
Posted 03 April 2012 - 11:38 AM
#230
Posted 04 April 2012 - 07:22 AM
Started dressing the welds, to make them look a bit better, trial fitted the windscreen in the car to make sure I had made the hole for it the right size.
Sorted out the inlet and carb, ready to be fitted,
Need to buy some stuff as some of the old bits are dead or dying.
Need
Hoses (silicone)
Fuel pump
I am sure the list will get longer as the week goes on, so that will mean a trip to somerford on the way home from work tomorrow.
Spoke to Prawn last night, he will be delivering his wheels and brake set up to me on Sunday, so that will mean I can get the shafts and hubs in next week.
Tonights tasks, Brake lines and MAYBE engine in
Turn engine over by hand to see if all is ok - 02.04.12- Set tappets - 02.04.12
- Fit rocker cover - TBC
Weld A panels - 02.04.12- Seam seal and prime - Easter weekend
- Shultz the inside of the wings, - Easter weekend
Fit brakes and front brake lines, cylinders etc - TBCFinish off winscreen surround - Start 02.04.12Paint windscreen surround - Easter weekend- Fit windscreen - As above
Fit engine and linkages, - TBCFit manifold and exhaust - TBCFit the top end, carbs, inlet etc. - TBCFit new rad. - TBC- Paint front end. - Easter weekend
- Fit lights and brightwork back to the car. - After the easter weekend
Edited by mymini007, 07 April 2012 - 11:58 PM.
#231
Posted 04 April 2012 - 11:08 PM


Got some acid etch around the welds and any bare metal, and Rich has been fitting the brakes,

Turned the engine over, seemed a but tight at first, would not turn, was hearing a metal on metal noise, ...........realised I had left a shell in the flywheel. Once that had been removed, it all turned over just fine.
Edited by mymini007, 04 April 2012 - 11:10 PM.
#232
Posted 05 April 2012 - 05:26 PM

Not sure whether to paint or polish?
#233
Posted 07 April 2012 - 11:53 PM





Manifold done, carb on, inlet on, servo on, brake linkage done, rad in, fan on.
The engine stabilizer bolt hole was not in the best condition, so we had to make up a bracket. But so far everything else seem ok.
#234
Posted 08 April 2012 - 08:31 AM
#235
Posted 10 April 2012 - 09:04 AM
Should be able to get the seams sealed up tonight too? And maybe even some primer on.
Soooo - New to do list
Set tappetsSeam seal and prime- Shultz the inside of the wings
Rocker coverFit driveshafts- Fit brake calipers
tighten up all the ball joint nuts and connect steering rack- Connect up exhaust
Fit fan belt- Fit clutch master cylinder
Plumb in carband electricsFill and prime- Flat and more primer
- Windscreen
- Remove bonnet front lip
- Fit leather bonnet straps
- Fit rear bonnet pins
- Paint front end
- Fit doors
- Refit interior - dash etc
- Fit lights and brightwork back to the car
Edited by mymini007, 11 April 2012 - 09:57 PM.
#236
Posted 10 April 2012 - 10:32 PM
It has 4 wheels again, although - I still need to torque up the castle nuts and get the pins in, as well as fit the calipers etc.

Drive shafts and carriers etc, all fitted,

A bit more plumbing in the engine.

Gave a little bounce on the front to test the new springs, they feel like real suspension
#237
Posted 11 April 2012 - 09:59 PM
Fan belt is now on, started to sort out the electrics, all jobs that dont look like much, but have to be done.
#238
Posted 12 April 2012 - 07:00 AM
I need to order a couple of bit but it should be running by the end of the week.
Clean and fit brake calipers
Fit gear linkage
Fit exhaust
Fit thermostat housing
Filling flatting rubbibg and priming
Only 21 days to Riv run, and I still have to have it MOTd snd set up on the rollers yet
Edited by mymini007, 12 April 2012 - 07:23 AM.
#239
Posted 12 April 2012 - 03:04 PM
Tonights activities
I need to order a couple of bit but it should be running by the end of the week.
Clean and fit brake calipers
Fit gear linkage
Fit exhaust
Fit thermostat housing
Filling flatting rubbibg and priming
Only 21 days to Riv run, and I still have to have it MOTd snd set up on the rollers yet
Sounds like 20 days of on the road testing to me then
#240
Posted 12 April 2012 - 03:41 PM
Tonights activities
I need to order a couple of bit but it should be running by the end of the week.
Clean and fit brake calipers
Fit gear linkage
Fit exhaust
Fit thermostat housing
Filling flatting rubbibg and priming
Only 21 days to Riv run, and I still have to have it MOTd snd set up on the rollers yet
Sounds like 20 days of on the road testing to me then
Sill needs electrics, paint and all the extrior bolting back on.
Edited by mymini007, 12 April 2012 - 03:41 PM.