My Project Mini Mayfair (pearl)
#46
Posted 06 January 2012 - 09:05 PM
#47
Posted 07 January 2012 - 07:25 PM
Thanks for the kind comments, they're much appriciated.
I've managed to get the N/S sill on now! YAY, its took me long enough, Lol. Anyway, pics;







Thanks for looking, Andy.
#48
Posted 09 January 2012 - 09:12 PM
Keep it up,
Graham
#49
Posted 30 May 2012 - 08:42 PM
Once again long overdue an update.
I have been busy with the latest edition to the mini fan scene, my beautiful baby boy. He was born 9th May and has already been introduced to the mini with the hope he follows in his dads footsteps of mini obsession.

I have only done a small amount since the last update, which includes finishing off the passenger side floor and prinering that side, flipping the shell over, and removing the drivers side sill. On to the pictures;




Thanks all for looking, Andy.
#50
Posted 30 May 2012 - 08:43 PM
The projects looking good
#51
Posted 14 August 2013 - 08:39 PM
Hey all,
It's been over a year and I've barely done anything on the mini! So once again I thought I had best get going on it again.
So the other night i went out the garage an started repairing the drivers side inner sill, it took just three patches to get a solid sill. I've also started the prep for the subframe mount, closing panel, and a repair patch for the arch.
On to the photos;
I'm sure I've got another photo of the other two holes in the middle of the sill before welding commenced, but can't find it at the moment, I'll keep looking though.
Thanks for looking, Andy.
#54
Posted 17 August 2013 - 02:30 PM
Cracking work!
Keeping an eye on this ![]()
#55
Posted 18 August 2013 - 08:09 PM
Hey all,
I've done a little more, the subframe mount is now welded on. It seemed to take forever to get the prep just right before I could even touch the welder, but I suppose with most jobs, the work is in the prep!
Anyawy, photos;
I need to dress the welds just in case you were wondering.
I've also started to cut the wheel arch out, I had originally planned to just patch the arch, but thought it would give a better finish if the whole thing was replaced.
Thanks for looking, Andy.
#57
Posted 25 May 2014 - 11:17 PM
Hey all,
I hope you're all doing well. I have managed to get back into the garage to get a little more done on Pearl.
I've been concentrating on getting the boot floor done, which has proven more work than I had anticipated.
The first task was to get the boot floor done, to do this, I welded in supports to hold the subframe reinforcement bracket in place to hold the subframe mounting holes in place;
This then allowed me to cut out the rust from the back of the boot floor. But before I could weld it in, a repair was required below the rear light.
I then welded the boot repair patch in, along with about four other patches along where the arch attaches to make the boot floor solid again.
This then allowed me to weld on the subframe mount panel and valance closing panel;
It needs finishing as its a bit distorted, but that'll come later. The next job is the rach and closing panel.
Andy.
#58
Posted 25 May 2014 - 11:34 PM
So, on to the arch and closing panel. I chose to weld the closing panel in first to hold the 3/4 panel in place to help me weld the arch in.I then welded the arch in place, and dressed the welds followed by zinc primer.
I still need to weld the inner arch supports and to the 3/4 (which is being replaced) once the car is upright again.
I have also red oxide'd the valance closing panel and inner sill and along with seam sealer for the valance closing panel.
Photos;
I have made up the OEM mounting brackets for inside the sill so they'll be welded in next followed by the sill, so hopefully the next update won't be as far away as these last two.
Thank you all for your interest, Andy.
#59
Posted 20 January 2015 - 11:00 PM
Hey all,
Well...... I feel like a broken record with this project thread.... once again an overdue update! It seems I'm managing to do short bursts every six months, so heres the work I did about six months ago;
I have managed to install the rear valance, where i painted inside the closing panels with zinc primer, red oxide and underseal paint. I also gave inside the sill void the same treatment and welded in the OEM mounting point and welded the sill on exept where it meets the 3/4 panel; as this needs replacing.
I have started this six monthly short burst, and have so far put her up straight again, installed the door and pinned the A-panel on the drivers side.
Thanks for looking, Andy.
0 user(s) are reading this topic
0 members, 0 guests, 0 anonymous users













































