Jump to content


Photo
- - - - -

1979 Mini 1000 (Becky)


  • Please log in to reply
19 replies to this topic

#16 robminibcy

robminibcy

    Camshaft & Stage Two Head

  • Members
  • PipPipPipPipPipPipPipPip
  • 1,516 posts
  • Location: birmingham

Posted 13 September 2014 - 04:01 PM

PicsArt_08_07_201410_37_19PM_zps04745fae



#17 robminibcy

robminibcy

    Camshaft & Stage Two Head

  • Members
  • PipPipPipPipPipPipPipPip
  • 1,516 posts
  • Location: birmingham

Posted 13 September 2014 - 04:10 PM

We are now up to date! The current job is the engine. her original a series is on well over 100K and runs very nicely but is leaking oil in the words of the last mot tester "like a sieve" and hes right it is! its so bad I have to top it up neatly every time I drive it It also blue smokes very badly so its time for a rebuild. I have another a+ engine from a very kind member on here which I will drop in whilst the original is rebuilt.

 

Here is the A+ being picked up:

temporary_zpscd26f998.jpg

 

I am changing a few gaskets, the clutch and the final drive (to 3.1) before it goes in as well as painting and generally making it pretty!

 

More to follow!



#18 robminibcy

robminibcy

    Camshaft & Stage Two Head

  • Members
  • PipPipPipPipPipPipPipPip
  • 1,516 posts
  • Location: birmingham

Posted 13 September 2014 - 04:19 PM

the engine just starting to clean strip down and wire brush:

temporary_zpsd2efdd06.jpg

 

temporary_zpsb5789e78.jpg

bit cleaner

 

temporary_zps5b1a26b4.jpg

All cleaner and wire brushed back to bare metal ready for paint

 

temporary_zps9b998a34.jpg

Etch primed

 

temporary_zps38131682.jpg

Painted :-)



#19 robminibcy

robminibcy

    Camshaft & Stage Two Head

  • Members
  • PipPipPipPipPipPipPipPip
  • 1,516 posts
  • Location: birmingham

Posted 28 September 2014 - 07:40 PM

Starting the big push to get the engine done now as I don't really fancy doing engine swaps at - temperatures!
Today got fly wheel of ready to swap to a preverto clutch. Used guessworks puller and was very easy and cooperative!
temporary_zps6e285454.jpg
temporary_zps45dabd7c.jpg
Flywheel off.
temporary_zps1d401917.jpg
Fly wheel housing off ready to clean up and change the gasket.

#20 robminibcy

robminibcy

    Camshaft & Stage Two Head

  • Members
  • PipPipPipPipPipPipPipPip
  • 1,516 posts
  • Location: birmingham

Posted 04 August 2015 - 10:02 PM

Thought it about time for an update! Nothings really happened over the last year. Shes been running and driving very well. Even the engine swap was put on hold as I kept being given old engine oil to put through her old smokey leaky engine! With the MOT looming however I think shes earned some presents!

Starting with swapping the rear right hand radius arm:

temporary_zpsnt8itlad.jpg

temporary_zpseylvlepn.jpg

 

Over the next month she will be having:

Radius arm swap

Rear brake overhaul and different wheel cylinders

Full cooper S brake install (currently still on drums)

Engine swap.

 

Mechanically then she should be 100% :-)






1 user(s) are reading this topic

0 members, 1 guests, 0 anonymous users