jobs done...
stripped back to bare shell
remove all interior
removes both front wings
got engine running just to check all is okay
started cleaning under arches with mbx tool, back to bare metal
engine and front subframe ready to drop straight out
removed doors and door hinges (hoping to be able to just get new skins)
as you can see this is a long term project, and i am hoping to have it on the road by 9/2/2013, and dont worry i wont be de-seaming or transplanting just yet, the standard 850 will stay in place for now, with maybe a few mods like cylinder head etc. trying to keep the car as original as possible so will also be painting the car the original smoked grey (with a white roof) got some 10" minilites to go straight on... if anyone knows anywhere to get cheap 7.5" front brakes please message as would be very helpful (on small budget)
thanks guys