So, i am starting early to get it ready for Brittish Mini Showdown. The car will be totaly stripped, body work sorted with some extra mods for clearances of wheels and exra room under the bonnet for the 16valver turbo later on. Removal of all under seal and sound deadening, total respray with stone chip on the underside and engine bay first, with plenty of dynamat or similar on the inside.
Once the body is sorted, subframes will be modified for anti roll bars and powder coated, all running gear overhauled and painted up,
Once the car is back together the 1400 should be complete by then and will be installed, set up and then everything checked over ready for the MOT.
MOT, fix any issues and then a trip to the rollers to check that my mods to the injection system are adequete to stop the 1400 melting as it would normaly have run out of fueling at 90BHP (I'm looking for 100BHP+)
The start of the project is now complete. That was the preperation of my Mum and Dads garage, installing shelving and work benches to get all of my dads junk off the floor, he realy is a hoarder, bit like me realy


Stage one complete