RIGHT THEN!!!!
Nearly done so thought id post a build log:
Nice big build space empty and ready to go.
1.jpg 65.36K
20 downloads
Frame Metal arrived, pre-cut, saved SO much work, and likely to be more accurate than i could do myself anyway.
2.jpg 64.19K
17 downloads
WOOO!! My Laser cut parts came, I ordered 5 full sets (Minimum order!!)
3.jpg 59.88K
20 downloads
Mockup layout, looks like it should work.
4.jpg 82.3K
11 downloads
ok, time for a WELD... :-D
5.jpg 50.73K
17 downloads
I made up a jig from some scrap, makes life much easier.
6.jpg 90.36K
19 downloads
The centre hinges are the most important part of the build, the strength of these is paramount.
7.jpg 47.9K
17 downloads
8.jpg 47.26K
13 downloads
Looking good, if anything over-engineered, but id rather be safe than have the frame fall in half on the motorway...!!!!
9.jpg 68.46K
26 downloads
One set finished, now for the other.
10.jpg 71.63K
22 downloads
Both sets complete.
11.jpg 55.18K
16 downloads
timelapse................
much swearing, welding, burning etc later, we have a nearly complete frame!!
12.jpg 55.14K
31 downloads
Frame basically complete, need to cut down the A-frame still but you get the idea.
13.JPG 99.96K
46 downloads
And the frame in its folded position, immediately its obvious how much space this will save.
14.JPG 98.25K
68 downloads
Next I need to mount the winch, arches and electrics, send the frame for galvanising, and get the tread-plate ordered.