Hello chaps. I'm busting to go full steam ahead on my new shell to get it prepped and painted before the season turns too damp to do it, but i need a couple of welding jobs done. how much am i looking at paying for each of these, if i prep everything up to the point of welding (cut out rotten metal, fit panel/patch, weld-through prime, and tack in place)? Esentially i'm just looking forsomeone to come out and run some welds for me.
I need:
driver's wing replacement.
head lamp repair piece on other wing.
drivers Upper flitch panel bit around air vent (will be accessible after wing is removed)
This bit on both sides

(the bit in the door bin isn't the bit that indicates a problem with the subframe mounts- its just a direct hole to see the ground below.)
Any ideas on welding costs?
Cheers guys?