so ive had a nightmare this last two weeks trying to get the subframe mount/closig panels as i wanted them [as you may have seen elswhere on the forum] today i had a word with myself as i was building it up to be a far bigger problem than it should be
so take a step back then charge so firstly to change my focus for a bit i made an inner cill stiffener going for strength here not originality its just mild steel 1.2mm bent into a u section 15 mm lip internal ten mm external face. this is going to be welded to the bottom of the b pillar and to the closing panel
i couldnt be bothered getting the bender out so i used a peice of box section clamped the sheet of steel to it and used a panel beating hammer to turn the lips down
the inner cills have also been beefed up to 1.2 mm reason being its having a rollcage and would give something a bit more substantial to weld in the corner boxes around the cages feet
just before i offered this stiffener into place to trim ect as needed i removed the closing plate i had clamped in [it wasnt sitting right anyway] there was a definite drop of the shell so i used a ratchet strap both sides in the centre of the shell just beind the b pillar i have a box section welded across the shell here i checked the measurements heel board to rear mounting bot holes then front of wheel arch to front edge of the heelboard and everytjing is ******* on the gaps at the end of the hee;board to the closig panels i had have also gone theyre nice and snug so with everything in place supported checked double checked and zinc primered on mating faces tomorrow i will be crack ng the mig open
somehow and despite bracing the shell it had mved at some point wich was throwing me still dont know how unless my lad had been in the shed and moved it to get his bike out but either way its back on track
Edited by Wreckitralph1, 11 January 2020 - 05:49 PM.