Picked my my third R65 from my storage lock-up and this one seemed to be in slightly better condition than my other two, also it had the bottom mount fitted and my other two boxs didnt have this (i was just going to make up my own mounts) so that saved me some time, so i took the gearbox off, swapped the gearbox over and everything fitted back into the frame, and now i could bolt up the bottom rear mount, so now there is next to no movement in the engine.
Then i decided to offer up the engine to see how much bulkhead needed cutting:
After a few more times of offering it up and cutting i ended up with this, i also had grind some parts of the inlet for clearance:
So this meant i could bolt the tower mounts up now and have no rubbing and this shows the clearance:
Frame bolted in place:
So who thinks ill meet my deadline of August 31st 2009?
That means iv got 44 days, should be easily doable, but just depends on funds and how much time i can find.
Edited by Tomf, 18 July 2009 - 08:09 PM.